Implement the contingency plan which is included as part of its operation plan;
2. (13) Form 62-701.900(21), Waste Tire Processing Facility Quarterly Report, effective January 6, 2010. a. (21) Form 62-701.900(30), Monitoring Well Completion Report, effective January 6, 2010. Signs indicating the name of the operating authority, traffic flow, hours of operations and restrictions or conditions of disposal shall be posted. (64) Liner system means a system of leachate collection and liner layers comprised of natural or synthetic materials installed between the subgrade and the waste for the purpose of containing the waste and collecting and removing leachate. (7) Right of access. About a month before Josephs birthday, my husband []. Yard trash in a Class I landfill, except as may be allowed pursuant to Section 403.708(12)(c), F.S. Landfills that are designed to be constructed in phases or sections shall include provisions for temporary closure of solid waste disposal units if subsequent, planned filling on top of them will not occur for six months or longer. (18) Closure means the cessation of operation of a solid waste management facility and the act of securing such a facility so that it will pose no significant threat to human health or the environment. (27) Department means the State of Florida Department of Environmental Protection. (a) The requirements of Rules 62-701.330 through 62-701.630, F.A.C., do not apply to yard trash disposal facilities, provided that none of the prohibitions contained in Rule 62-701.300, F.A.C., shall be violated. (b) If the parameters detected in the detection wells identified in paragraph (a) of this subsection consist only of iron, aluminum, manganese, sulfates, or total dissolved solids (TDS), either individually or in any combination, then only the detected parameters are required to be monitored in the representative background wells, affected detection wells and downgradient compliance wells required in this section rather than the parameters listed in paragraphs (7)(a) and (7)(c). Rulemaking Authority 403.704 FS. (b) The owner or operator may apply for a modification of its ground water monitoring plan to reduce or eliminate the frequency of monitoring. c (c) Long-term care costs shall include land surface care; gas monitoring; leachate pumping, transportation, monitoring and treatment; ground water monitoring, collection and analysis; and any other costs of compliance with Rule 62-701.620, F.A.C. (105) Site means the area of land or water within the property boundaries of a solid waste management facility where one or more solid waste processing, resource recovery, recycling, storage, or disposal areas are located. Her brother was a couple years younger than us, and my brother was a few years older so she ended up marrying mine. The provisions in Chapter 62-780, F.A.C., regarding assessment and remediation of contamination in soils do not apply. (a) The owner or operator of a landfill that is owned or operated by a government agency shall establish a fee, or a surcharge on existing fees, or other appropriate revenue-producing mechanism, to ensure the availability of financial resources for the proper closing and long-term care of the landfill. A mandatory conference call for prospective respondents is scheduled for August 6, 2:00 p.m. EDT. Each section to note assignments and tasks that you are familiar with common methods Everase help ideas Teachers Principals from notice boards to magnetic notice boards your virtual whiteboard for Education class! Rulemaking Authority 403.061, 403.704 FS. The facility has been constructed with a leachate control system to prevent discharge of leachate and avoid mixing of leachate with stormwater, and to minimize the presence of standing water. (c) Applicants proposing to construct new landfills within a six mile radius, and applicants proposing to construct lateral expansions of existing landfills within a five-mile radius, of any licensed and operating airport runway used by turbine powered or piston engine aircraft shall notify the affected airport, the Federal Aviation Administration, and the Florida Department of Transportation when the application is filed with the Department, and shall provide evidence of such notification to the Department. The recovered materials or the products or byproducts of operations that process recovered materials are not discharged, deposited, injected, dumped, spilled, leaked, or placed into or upon any land or water that such products or byproducts or any constituent thereof may enter other lands or be emitted into the air or discharged into any waters, including ground water, or otherwise enter the environment such that a threat of contamination in excess of applicable water quality standards and criteria or air quality standards is caused;
3. However, lateral expansions of such facilities which occurred after May 19, 1994 are subject to the prohibitions of paragraph (2)(b) of this section. Have granular material or synthetic geotextile filter overlying or surrounding the leachate collection and removal system to prevent clogging of the collection system by infiltration of fine particles; and
4. 2. The hydraulic conductivity tests shall be conducted in triaxial type permeameters. (c) Provisions shall be made for evaluating the quantity of all incoming solid waste and recovered materials. Law Implemented 403.702, 403.704, 403.707 FS. (109) Solid waste disposal facility means any solid waste management facility which is the final resting place for solid waste, including landfills and incineration facilities that produce ash from the process of incinerating municipal solid waste. (11)(a) Used oil and oily wastes. (4) Modified ground water monitoring plan. 62-701.400 Landfill Construction Requirements. The plan shall include or refer to specifications and construction methods which use established engineering practices to construct a liner system and provide for quality control testing procedures and sampling frequencies. (f) Declaration to the public. The types of materials, i.e., wastes, recyclable materials or recovered materials, to be managed or processed;
2. (e) The owner or operator may make expenditures from the account and its accumulated interest only for the purpose of landfill closing and long-term care and, if such expenditures do not deplete the fund to the detriment of eventual closing and long-term care as described under the certification procedure in subsection (4) of this section, for planning and construction of resource recovery or landfill facilities. (a) The landfill operator is responsible for leachate level monitoring, sampling, analysis of the landfill leachate, and for providing copies of the leachate analysis to the Department. The liner shall be placed on a prepared subgrade that will not damage the geomembrane liner or the GCL. 7. HistoryNew 5-27-01, Amended 1-6-10, 8-12-12. (7) Cost estimates for corrective action. 1. b. ;
(d) Immediately after the activity is completed, the landfill will be covered, vegetated, and graded to comply with the closure requirements that apply to that landfill, which shall include a final cover of at least two feet of soil; and
(e) The appropriate District Office of the Department is notified at least seven days before the activity takes place in order to have the opportunity to inspect the site. Cross sections shall be included on the plot plan or on separate sheets showing both the original and proposed fill elevations. Leachate storage tanks in use on January 6, 1993 are not required to retrofit to comply with this subsection unless leakage, corrosion or other defects are found. 5. (a) An engineering report, signed and sealed by a professional engineer, that includes:
1. Immediately take steps to reduce the objectionable odors. If the renewal application is submitted at a later date, it will not be considered timely and sufficient unless it is submitted and made complete prior to the expiration of the existing permit. At a minimum, the index tests shall consist of percent fines, Atterberg limits and moisture content determinations. Rulemaking Authority 403.061, 403.704 FS. (32) Fill means man-made deposits of earth or waste materials used to fill excavations, to increase the vertical or horizontal extent of land or solid waste disposal units, or to build embankments. Once closure construction has been completed, the landfill owner or operator shall file a declaration to the public in the deed records in the office of the county clerk of the county in which the landfill is located. A notice of such payment shall be submitted to the Department. (b) A site plan, of a scale not greater than 200 feet to the inch, which shows the facility location, total acreage of the site, and any other relevant features such as water bodies or wetlands on or within 200 feet of the site and potable water wells on or within 500 feet of the site;
(c) A boundary survey and legal description of the property;
(d) A construction plan, including engineering calculations, that describes how the applicant will comply with the design requirements of subsection 62-701.710(3), F.A.C. The load-checking program shall consist of the following minimum requirements:
1. (8) Official date of closing. 7. HDPE geomembranes and LLDPE geomembranes shall have factory and field seams whose shear and peel strengths during testing are in conformance with the seam strengths specified in method GRI GM19. (b) The facility shall be designed with a leachate control system to prevent discharge of leachate and avoid mixing of leachate with stormwater, and to minimize the presence of standing water. The maintenance schedule shall be a part of the facility operation plan. 8. Each landfill owner or operator shall have an operational plan that provides written, detailed instructions for the daily operation of the landfill. (38) Geocomposite means a product composed of two or more materials, at least one of which is a geosynthetic. Jul 18, 2015 - Explore Nancy Spencer's board "Magnetic Whiteboard" on Pinterest. Except as otherwise specified in a Department permit or order or in subsection (6) of this section, frequency of sampling and analysis shall comply with the following. Any alternative liner system shall be approved only in accordance with the provisions of Rule 62-701.310, F.A.C. No more scheduling headaches or sending people off site. The notification shall include:
(a) A site plan, of a scale not greater than 200 feet to the inch, that shows the project location and identifies the proposed disposal areas, total acreage of the site and of the proposed disposal area, and any other relevant features such as water bodies, wetlands, or potable water wells within 100 feet of the site;
(b) Identification of ground water levels at the site, including the seasonal high ground water level if known;
(c) A general description of the facility operations, including equipment and personnel planned for the operation and closure of the facility, and a training plan which complies with the requirements of subsection 62-701.320(15), F.A.C.